Special Risks

1. Nchwaning 1

  • Client: DRA Global (Pty) Ltd
  • Project Location: Black Rock, Northern Cape
  • Project Duration: 6 Months
  • Project Completion: Current, Due for Completion 2019
  • Project Description: Design, Fabrication, Procurement, Supply, Installation and Commissioning of Fire Protection Systems for Underground Conveyors, MCC's and Hydraulic Packs. 

2. Kusile Boiler Units 1-3

  • Client: Mitsubishi Hitachi Power Systems Africa (Pty) Ltd
  • Project Location: Kusile Power Station, Mpumalanga
  • Project Duration: 18 Months
  • Project Completion: Current, Due for Completion 2017
  • Project Description: Design, Fabrication, Procurement, Supply, Installation and Commissioning of Fire Protection Systems for the Boiler Units 1 to 3 at Kusile Power Station. Design Excluded for Unit 1. 

3. Medupi Boiler Units 3-1

  • Client: Mitsubishi Hitachi Power Systems Africa (Pty) Ltd
  • Project Location: Medupi Power Station, Limpopo Province
  • Project Duration: 18 Months
  • Project Completion: Current, Due for Completion 2018
  • Project Description: Design, Fabrication, Procurement, Supply, Installation and Commissioning of Fire Protection Systems for the Boiler Units 3 to 1 at Medupi Power Station. 

4. Medupi Boiler Units 4-6

  • Client: Mitsubishi Hitachi Power Systems Africa (Pty) Ltd
  • Project Location: Medupi Power Station, Limpopo Province
  • Project Duration: 18 Months
  • Project Completion: Completed
  • Project Description: Fabrication, Procurement, Supply, Installation and Commissioning of Fire Protection Systems for the Boiler Units 4 to 6 at Medupi Power Station. 

5. Moatize Expansion II Project

  • Client: Vale
  • Project Location: Tete, Mozambique
  • Project Duration: 8 Months
  • Project Completion: Completed
  • Project Description: Turnkey contract with differing aspects to the project. KRS is responsible for the Design, Supply, Installation and Commissioning for the HMV and Daily Maintenance Workshops (Foam Monitor Systems); HMV and Daily Maintenance Offices (ASIB Sprinkler Systems); MCC’s and Substations (Gas Suppression Systems) and site Wide Buildings Including Offices, Change Rooms etc. (Smoke Detection Systems). 

6. Sishen MCC’s

  • Client: Kumba Iron Ore
  • Project Location: Sishen, Northern Cape
  • Project Duration: 12 Months
  • Project Completion: Completed
  • Project Description: Supply, Install and Commissioning of Gas Suppression Systems to 30 Substations 

7. FATA Avon and Dedisa Peaking Power Plants

  • Client: Tyco
  • Project Location: Durban and Port Elizabeth, South Africa
  • Project Duration: 7 Months and 5 Months
  • Project Completion: Completed
  • Project Description: Supply and Install System Pipe Work and Install Fire Protection Equipment as well as Test and Commission Systems 

8. Orapa Lube Oil Tank Farm

  • Client: Debswana
  • Project Location: Orapa, Botswana
  • Project Duration: 3 Months
  • Project Completion: Completed
  • Project Description: Supply, Install and Commissioning of Exposure Protection and Bund Foam Systems 

9. Sasol Temane Loading Bays

  • Client: Sasol Petroleum International
  • Project Location: Temane, Mozambique
  • Project Duration: 2 Months
  • Project Completion: Completed
  • Project Description: Supply, Install and Commissioning of Foam / Water Deluge Systems for the Offloading Bays 

10. Sishen Ramp-Up Project, HME Filling Station

  • Client: Kumba Iron Ore
  • Project Location: Sishen, Northern Cape
  • Project Duration: 5 Months
  • Project Completion: Completed
  • Project Description: Supply, Install and Commissioning of Exposure Protection for Diesel Storage Tanks, Tank Top and Bund Foam Protection, Fire Water Storage and Pumping Facility. 